Driving offshore progress: the Wellhead Platform A (WHPA), a USD 1.4B EPIC project
Delivering offshore infrastructure at scale requires more than engineering excellence. It requires coordination, ownership, and the ability to transform complexity into progress.
Awarded by Mellitah Oil & Gas B.V., the Wellhead Platform A (WHPA) and Fast Moving Workover Rig (FMWR) project represents a USD 1.4 billion investment and one of the most significant EPIC developments currently underway in the Mediterranean offshore area.
The project is executed through a non-incorporated consortium led by KLN Project, combining offshore operations with onshore activities.
As Consortium Leader, we manage the full lifecycle, from project management and engineering to offshore installation, ensuring integration across technical, operational, and logistics functions.
The scope includes the development of the WHPA (jacket and topside), and a Fast Moving Workover Rig (FMWR) designed to increase energy production capacity up to a scale and complexity at state of the art offshore infrastructure.
Execution spans on a global footprint.
Across every phase, our role is to align engineering precision, project controls, marine operations, and stakeholder coordination into one integrated delivery model.
Through advanced project planning, risk management, logistics coordination, and data-driven project control, we help transform large-scale offshore challenges into reliable execution.
This is how we enable energy and industrial progress where it matters most.
EPCm
Offshore Libya
2024 – ongoing
Mellitah Oil & Gas B.V. (Libyan Branch)
EPIC – WHPA Platform & FMWR
USD 1.4 B